SL

Transparency information

TSO Transparency information according to Regulation 715/2009:

Annex to RegulationDescriptionLink
3.1.2 a)Description of the different services and their chargesExit points in RS

Network charge
3.1.2 b)Different transportation contracts and other significant documentsExit points in RS
3.1.2 c) Network code / standard conditions/significant requirementsNetwork Code

Transmission Agreement
3.1.2 d)Harmonised procedures applied when using the transmission system, including the definition of key termsLegislative framework
3.1.2 e)Provisions on capacity allocation, congestion management and anti-hoarding and reutilisation procedures
Legislative framework

Request for access

Transmission Agreement
3.1.2 f)Rules applicable for capacity trade on the secondary market vis-à-vis the transmission system operatorSecondary market
3.1.2 g)Rules on balancing and methodology for the calculation of imbalance chargesBalancing Group
3.1.2 h)Flexibility and tolerance levels included in transportation and with additional charges
Balancing Group
3.1.2 i)Detailed description of the gas system of TSO and its relevant points of interconnection / names of the operators of the interconnected systems or facilitiesOperation of transmission system
3.1.2 j)Rules applicable for connection to the systemConnection to the transmission network
3.1.2 k)Information on emergency mechanismsPlan of emergency measures
3.1.2 m)Description of the methodology and process used to calculate the technical capacityMethodology for determination of maximum technical capacity
3.3.Prenosne zmogljivosti, kalorična vrednost, nominacije in renominacije, realizirani fizični pretokiRelevant points data
3.3.Planned and actual interruptions
Planned maintenance
3.4.Information on secondary tradingSecondary market
3.4.Amount of gas in the transmission system and the forecastState of transmission system
3.4.User-friendly instruments for calculating tariffsNetwork charge calculator
Emergency calls 24h:
+386 1 582 06 66