Reduced transport at IP Šempeter - Exit (9/8/2023 - 9/21/2023)

Šempeter
From 9/8/2023 6:00:00 AM untill 9/22/2023 6:00:00 AM
Due to maintenance works on Slovenian pipeline system, the available transport at interconnection point (IP) Šempeter towards Italy will be reduced to 0 kWh/h in the specified period.
Da
MMRP Šempeter

Reduced transport at IP Šempeter - Entry (9/8/2023 - 9/21/2023)

Šempeter
From 9/8/2023 6:00:00 AM untill 9/22/2023 6:00:00 AM
Due to maintenance works on Slovenian pipeline system, the available transport at interconnection point (IP) Šempeter towards Slovenia will be reduced to 1.100.000 kWh/h in the specified period.
Da
MMRP Šempeter

Reduced transport at IP Šempeter (7/20/2023) - CANCELLED

Šempeter
From 7/20/2023 6:00:00 AM untill 7/20/2023 10:00:00 PM
Planned and previously published maintenance works on Slovenian pipeline system are cancelled for the day 20.7.2023 and postponned to later period. New date of this maintenance works will be published
Da
MMRP Šempeter

Reduced transport at IP Rogatec (5/26/2023 - 5/28/2023)

Rogatec
From 5/26/2023 3:00:00 PM untill 5/28/2023 3:00:00 PM
Due to maintenance works on Croatian pipeline system, the available transport at interconnection point (IP) Rogatec in direction towards Croatia will be reduced to 1,007,000 kWh/h in the specified period.
Da
MMRP Rogatec

Reduced transport at IP Šempeter - Exit (Aug. - Sep. 2022)

Šempeter
From 8/1/2022 6:00:00 AM untill 9/20/2022 6:00:00 AM
Due to maintenance works on Slovenian pipeline system, the available transport at interconnection point (IP) Šempeter towards Italy will be reduced to 0 kWh/h in the specified period.
Da
MMRP Šempeter

Reduced transport at IP Šempeter - Exit (May-Sep. 2022) - Abandoned with the publication on 06.05.2022

Šempeter
From 5/1/2022 6:00:00 AM untill 10/1/2022 6:00:00 AM
Due to maintenance works on Slovenian pipeline system, the available transport at interconnection point (IP) Šempeter towards Italy will be reduced to 0 kWh/h in the specified period.
Da
MMRP Šempeter

Reduced transport at IP Šempeter - Exit 22.3.2022

Šempeter
From 3/22/2022 6:00:00 AM untill 3/22/2022 1:00:00 PM
Due to maintenance works on Slovenian pipeline system, the available transport at interconnection point (IP) Šempeter towards Italy will be reduced to 0 kWh/h in the specified period.
Da
MMRP Šempeter

Reduced transport at IP Šempeter - Exit 8.3.2022

Šempeter
From 3/8/2022 6:00:00 AM untill 3/8/2022 6:00:00 PM
Due to maintenance works on Slovenian pipeline system, the available transport at interconnection point (IP) Šempeter towards Italy will be reduced to 0 kWh/h in the specified period.
Da
MMRP Šempeter

Reduced transport at IP Šempeter (4.10. - 27.10.2021)

Šempeter
From 10/4/2021 6:00:00 AM untill 10/27/2021 6:00:00 PM
Due to maintenance works on Slovenian pipeline system, the available transport at interconnection point (IP) Šempeter will be reduced to 540.417 kWh/h in the specified period.
Da
MMRP Šempeter

Reduced transport at IP Šempeter 21.9.2021

Šempeter
From 9/21/2021 6:00:00 AM untill 9/22/2021 6:00:00 AM
Due to maintenance works on Slovenian pipeline system, the available transport at interconnection point (IP) Šempeter will be reduced to 648.500 kWh/h in the specified period.
Da
MMRP Šempeter

Reduced transport at IP Šempeter 20.9.2021

Šempeter
From 9/20/2021 6:00:00 AM untill 9/21/2021 6:00:00 AM
Due to maintenance works on Slovenian pipeline system, the available transport at interconnection point (IP) Šempeter will be reduced to 0 kWh/h for the period from 9/20/2021 06:00:00 AM untill 9/20/2021 06:00:00 PM and to 270.208 kWh/h for the period from 9/20/2021 06:00:00 PM untill 9/21/2021 06:00:00 AM.
Da
MMRP Šempeter

Reduced transport at IP Rogatec (28.9 - 30.9.2020)

Rogatec
From 9/28/2020 6:00:00 AM untill 9/30/2020 6:00:00 AM
Due to maintenance works on Croatian pipeline system, the available transport at interconnection point (IP) Rogatec will be reduced to 806.400 kWh/h in the specified period.
Da
MMRP Rogatec

Reduced transport at IP Rogatec (15.9 - 17.9.2020) Abandoned with the publication of Plinacro on 27.8.2020

Rogatec
From 9/15/2020 6:00:00 AM untill 9/17/2020 6:00:00 AM
Due to maintenance works on Croatian pipeline system, the available transport at interconnection point (IP) Rogatec will be reduced to 895.000 kWh/h in the specified period.
Da
MMRP Rogatec

Reduced transport at IP Ceršak (7.9. - 11.9.2020)

Ceršak
From 9/7/2020 6:00:00 AM untill 9/11/2020 6:00:00 PM
Due to maintenance works on Austrian pipeline system, the available transport at interconnection point (IP) Murfeld/Ceršak will be reduced to 3.750.888 kWh/h in the specified period.
Da
MMRP Ceršak

Reduced transport at IP Ceršak (27.7. - 28.7.2020)

Ceršak
From 7/27/2020 6:00:00 AM untill 7/28/2020 3:00:00 PM
Due to maintenance works on Austrian pipeline system, the available transport at interconnection point (IP) Murfeld/Ceršak will be reduced to 3.750.888 kWh/h in the specified period.
Da
MMRP Ceršak

Reduced transport at IP Rogatec (24.6 - 26.6.2020)

Rogatec
From 6/24/2020 6:00:00 AM untill 6/26/2020 6:00:00 AM
Due to maintenance works on Croatian pipeline system, the available transport at interconnection point (IP) Rogatec will be reduced to 67.125 kWh/h in the specified period.
Da
MMRP Rogatec

Reduced transport at IP Rogatec (28.5.2020)

Rogatec
From 5/28/2020 8:00:00 AM untill 5/28/2020 8:00:00 PM
Due to maintenance works on Croatian pipeline system, the available transport at interconnection point (IP) Rogatec will be reduced to 895.000 kWh/h in the specified period.
Da
MMRP Rogatec

Reduced transport at IP Ceršak (8.10. - 14.10.2019)

Ceršak
From 10/8/2019 6:00:00 PM untill 10/14/2019 6:00:00 PM
Due to maintenance works on Austrian pipeline system the Austrian transmission system operator Gas Connect Austria (GCA) has published on its Web page (https://www.gasconnect.at) the available capacity at Murfeld Exit of type "FZK" 0 MWh/h. Physical flow up to 41% of technical capacity Murfeld Exit will be possible - up to approx. 1.922 MWh/h.
Da
MMRP Ceršak

Reduced transport at IP Ceršak (4.10. - 8.10.2019)

Ceršak
From 10/4/2019 6:00:00 AM untill 10/8/2019 6:00:00 PM
Due to maintenance works on Austrian pipeline system the Austrian transmission system operator Gas Connect Austria (GCA) has published on its Web page (https://www.gasconnect.at) the available capacity at Murfeld Exit of type "FZK" is 0 MWh/h. Physical flow up to 28% of technical capacity Murfeld Exit will be possible - up to approx. 1.313 MWh/h.
Da
MMRP Ceršak

Reduced transport at IP Rogatec (24.9. - 26.9.2019)

Rogatec
From 9/24/2019 10:00:00 AM untill 9/26/2019 10:00:00 AM
Due to maintenance works on Croatian pipeline system, the available transport at interconnection point (IP) Rogatec will be reduced to 806.400 kWh/h in the specified period.
Da
MMRP Rogatec