Ten Year Gas Transmission Network Development Plan for the 2023 – 2032 period
The company Plinovodi is preparing a Ten Year Network Development Plan for the Slovenian natural gas transmission system for the period between 2023 and 2032. The draft of the document (in Slovene language) is published for public consultation between 21 April and 21 May 2022. The company Plinovodi has invited all interested public representatives to present comments, suggestions or additions to the draft document within the public consultation procedure. The Ten Year Gas Transmission Network Development Plan for the 2023-2032 period will be completed in the following months.
Ten Year Gas Transmission Network Development Plan for the 2023-2032 period (draft document in Slovene language)
Project information form
Ten Year Gas Transmission Network Development Plan for the 2022 – 2031 period
The Energy Agency has issued a Decree (nr. 111-19/2021/8) on the 22nd of November 2021 about the confirmation of the Ten-Year Gas Transmission Network Development Plan for the 2022-2031 Period.
Documents:
Gas Regional Investment Plan 2017
The requirement to promote regional cooperation is written in EU Directive 2009/73/EC and further detailed by EU Gas Regulation (EC) 715/2009, which requires European TSOs to publish Gas Regional Investment Plans (GRIPs) on a biennial basis. Based on an analysis of transmission system interconnections and operation, as well as infrastructure development needs, TSOs in the frame of ENTSOG agreed on six regional groupings. The company Plinovodi cooperates in two of those regional groups and helped prepare two GRIP documents: GRIP CEE (Central-Eastern Europe), which was published on the 19th of May 2017, and GRIP SC (Southern Corridor), which was published on the 19th of September 2017.
GRIP CEE 2017
GRIP Southern Corridor 2017