Taking into account Regulation (EC) No 715/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the natural gas transmission networks and repealing Regulation (EC) No 1775/2005, Commission Regulation (EU) 2017/460 of 16 March 2017 established a network code on harmonised transmission tariff structures for gas (TAR NC). Among other the TAR NC sets rules for reference price methodology application, consultation requirements and obligation for publishing the standard reserve price capacity products. To increase the transparency of transmission tariff structures and procedures towards setting them, the TAR NC sets an obligation for publishing information related to the determination of the revenues of TSO.
On the basis of TAR NC and the Decision by the NRA, Plinovodi d.o.o. as a TSO, is publishing the information required by Article 29 and 30 of TAR NC, in accordance with the requirements set out in Article 31 and 32. The information is published in a standardised table, not later than thirty days before annual yearly capacity auctions or thirty days before the tariff period January- December. In accordance with Article 29 the information in the table contains applicable reserve prices, multipliers and seasonal factors with justification for the application and an assessment of the probability of interruption for standard capacity products for interruptible capacity. In accordance with Article 30 the information in the table contains technical characteristics of the transmission network, information in regards to used reference price methodology, TSO revenue information, transmission and non-transmission tariffs and simplified tariff model.