Tariffs

Tariff for entry capacities:

Name of entry point (e)Entry tariff for year 2024 [cent/(kWh/day)]Entry tariff for year 2025 [cent/(kWh/day)]Entry tariff for year 2026 [cent/(kWh/day)]Entry tariff for year 2027 [cent/(kWh/day)]
MMRP Ceršak12,6398414,0820014,3918014,70842
MMRP Šempeter pri Novi Gorici9,3123614,0820014,3918014,70842
MMRP Rogatec3,0768814,0820014,3918014,70842
Entry points inside of Republic Slovenia8,1280214,0820014,3918014,70842

Tariff for exit capacities:

Name of exit point (e)Exit tariff for year 2024 [cent/(kWh/day)]Exit tariff for year 2025 [cent/(kWh/day)]Exit tariff for year 2026 [cent/(kWh/day)]Exit tariff for year 2027 [cent/(kWh/day)]
MMRP Ceršak11,3748714,0820014,3918014,70842
MMRP Šempeter pri Novi Gorici10,3474314,0820014,3918014,70842
MMRP Rogatec3,4179114,0820014,3918014,70842
Exit points inside Republic of Slovenia56,3045367,3470068,8286370,34286

Multipliers and Seasonal factors:

Multipliers and Seasonal factors are used for calculating reference price for short term standard capacity products for all Interconnection points and all points inside Republic of Slovenia.

Multipliers for standard capacity products for tariff period 2022, 2023, 2024 and 2025
 
Quarterly (Mq)1,4000
Monthly (Mm)1,4500
Daily (Md)2,7500
Within-daily (Mzd)2,8000
Seasonal factors for standard capacity products for tariff period 2022 in 2023    
Month (m)QuarterlyMonthlyDailyWithin-day
 SQ(m)SM(m)SD(m)SZD(m)
January1,6171,6171,6171,617
February1,6171,5271,5271,527
March1,6171,2281,2281,228
April0,7510,7650,7650,765
May0,7510,7480,7480,748
June0,7510,7120,7120,712
July0,7140,6570,6570,657
August0,7140,9820,9820,982
September0,7140,7170,7170,717
October1,2110,8780,8780,878
November1,2111,1431,1431,143
December1,2111,2111,2111,211
Seasonal factors for standard capacity products for tariff period 2024    
Mesec (m)QuarterlyMonthlyDailyWithin-day
 SQ(m)SM(m)SD(m)SZD(m)
January1.1781.0831.0831.083
February1.1781.1781.1781.178
March1.1781.1731.1731.173
April0.7850.9050.9050.905
May0.7850.7420.7420.742
June0.7850.6930.6930.693
July0.6960.6760.6760.676
August0.6960.6830.6830.683
September0.6960.8020.8020.802
October1.2301.0821.0821.082
November1.2301.4791.4791.479
December1.2301.6871.6871.687
Seasonal factors for standard capacity products for tariff period 2025    
Mesec (m)QuarterlyMonthlyDailyWithin-day
 SQ(m)SM(m)SD(m)SZD(m)
January1.2691.4281.428
1.428
February1.269
1.2851.285
1.285
March1.269
1.2691.269
1.269
April0.7851.0581.058
1.058
May0.7850.7710.7710.771
June0.7850.6390.6390.639
July0.6700.6130.613
0.613
August0.6700.5700.570
0.570
September0.6700.6790.679
0.679
October1.2300.9840.984
0.984
November1.2301.4051.405
1.405
December1.2301.5381.538
1.538

Network Users are, regarding their booked capacity, arranged into eight tariff groups with different exit tariff ratio k, as follows.

Exit tariff ratio k in year:

 Exit tariff ratio k in year   
Booked exit capacity inside Republic of Slovenia (kWh/day)2021202220232024
0≤ PK<50.0001,3781,2521,1261,000
50.000 ≤ PK<100.0001,2221,1481,0741,000
100.000 ≤ PK<250.0001,1201,0801,0401,000
250.000 ≤ PK<500.0001,0841,0561,0281,000
500.000 ≤ PK<1.000.0001,0421,0281,0141,000
1.000.000 ≤ PK<2.000.0001,0181,0121,0061,000
2.000.000 ≤ PK1,0001,0001,0001,000
Distribution1,0001,0001,0001,000

Tariff for metering:

Metering charge depends on the number and type of metering device and the number of pressure reduction points in metering-regulating station.

Tariff for meteringCM for year 2024CM for year 2025CM for year 2026CM for year 2027
[EUR/month]22,1010322,8524723,3552223,86903

Tariff for fuel gas:

Fuel gas charge is compensation for consumption of natural gas used for operating the compressor and gas for heating regulation facilities. Fuel gas charge is proportioned to the amount of transported quantities of natural gas through the transmission network and is charged on exit points.

Tariff for fuel gasCLR for year 2024 [cent /kWh]CLR for year 2025 [cent/kWh]CLR for year 2026 [cent/kWh]CLR for year 2027 [cent/kWh]
[cent/kWh]3,25403,25403,25403,2540

Fee for exceeding the booked capacity is charged in case of exceeding the booked capacity.

The amount of the contribution to the energy efficiency depends on the monthly transported quantities of natural gas through transmission network and is charged to consumers in Republic of Slovenia. The amount of fee is determined by the Regulation on the provision of energy savings (Official Gazette of RS, no.96/14 and 158/20-ZURE).

Access to natural gas transmission network for periods shorter than a year and on interruptible basis is charged in accordance with Act methodology for calculation of transmission network charge for natural gas (Official Gazette of RS, no 20/19, 8/20, 85/20 and 48/21).

Emergency calls 24h:
+386 1 582 06 66