Information on Incremental capacity process for interconnection point Rogatec
We would like to inform all interested stakeholders that, after preliminary consultation with the Slovenian regulatory authority and obtaining information from the Croatian transmission system operator Plinacro d.o.o, Plinovodi d.o.o. and Plinacro d.o.o., will not be initiating the incremental capacity project at the Rogatec entry/exit point. The capacity at the Rogatec entry point on the Slovenian side will be increased to 1.1 billion cubic meters per annum by the end of 2026, through investment maintenance upgrades and in regards to security of supply. In line with this, the gas pipeline on the Croatian side, funded for the construction of the Lučko-Zabok gas pipeline, is expected to be constructed within the same timeline.
Nevertheless, to comply with the provisions set in Article 26 of the CAM NC the non-binding incremental market demand assessment due in 2025, will be conducted according to the schedule provided in the CAM NC.
Plinovodi d.o.o. has conducted a non-binding market demand survey on incremental capacity for interconnection points among Network Users between 06th April 2017 and 01st June 2017 according to the Articles 26-29 of the Commission Regulation (EU) 2017/459. Plinovodi d.o.o. together with adjacent TSOs publishes demand assessment report for interconnection points Murfeld/Ceršak, Gorizia/Šempeter, Rogatec and Tornyiszentmiklós/Pince.
Based on the demand assessment report for incremental capacity between Austria and Slovenia, the planned incremental capacity project is being consulted between 19.10.2017 and 19.11.2017. The Users can submit their possible comments to the mailbox skr@plinovodi.si.
Based on the demand assessment report for incremental capacity between Croatia and Slovenia, the planned incremental capacity project is being consulted between 29.11.2017 and 29.12.2017. The Users can submit their possible comments to the mailbox skr@plinovodi.si.
Demand Assessment Report between Slovenia and Hungary
Plinovodi d.o.o. has conducted a non-binding market demand survey on incremental capacity of the Hungarian-Slovenian bidirectional gas flow. In cooperation and together with adjacent TSO FGSZ the Demand Assessments Report, according to the Articles 26 to 28 of Commission Regulation (EU) 2017/459, for interconnection point Tornyiszentmiklós/Pince was agreed and published.
Demand Assessment Report 2023
Plinovodi d.o.o. has conducted a non-binding market demand survey on incremental capacity for interconnection points among System users between 3th July 2023 and 28th August 2023, according to the Articles 26-29 of the Commission Regulation (EU) 2017/459. Plinovodi d.o.o. publishes demand assessment report for interconnection points Murfeld/Ceršak, Gorizia/Šempeter, Rogatec and Tornyiszentmiklós/Pince.
Demand Assessment Report 2022
Plinovodi d.o.o. has conducted a non-binding market demand survey on incremental capacity for interconnection points among System users between 5th July 2022 and 30th August 2022, according to the Articles 26-29 of the Commission Regulation (EU) 2017/459. Plinovodi d.o.o. publishes demand assessment report for interconnection points Murfeld/Ceršak, Gorizia/Šempeter, Rogatec and Tornyiszentmiklós/Pince.
Information on Incremental capacity process for interconnection points 2019 and 2021
We would like to inform all interested stakeholders that, having preliminary consulted both the Hungarian and the Slovenian regulatory authority, Plinovodi d.o.o. and FGSZ Ltd. will not run binding incremental capacity auctions for Interconnection point between Slovenia and Hungary in July 2021. As these incremental capacities are connected in the corridor Hungary-Slovenia-Italy the binding incremental capacity auctions in July 2021 on Slovenian-Italian Interconnection Point will not run either.
Nevertheless, in order to comply with the provisions set in the Article 26 of the CAM NC the non-binding incremental market demand assessment due in 2021, will be conducted according to the schedule provided in the CAM NC. All interested parties are invited to follow the publications on the website www.plinovodi.si via which the market participants will be informed on the details of the market demand assessment procedure in 2021.
Demand Assessment Report 2021
Plinovodi d.o.o. has conducted a non-binding market demand survey on incremental capacity for interconnection points among Network Users between 5th July 2021 and 30th August 2021 according to the Articles 26-29 of the Commission Regulation (EU) 2017/459. Plinovodi d.o.o. together with adjacent TSOs publishes demand assessment report for interconnection points Murfeld/Ceršak, Gorizia/Šempeter, Rogatec and Tornyiszentmiklós/Pince.
Demand Assessment Report 2019
Plinovodi d.o.o. has conducted a non-binding market demand survey on incremental capacity for interconnection points among Network Users between 2nd July 2019 and 27th August 2019 according to the Articles 26-29 of the Commission Regulation (EU) 2017/459. Plinovodi d.o.o. together with adjacent TSOs publishes demand assessment report for interconnection points Murfeld/Ceršak, Gorizia/Šempeter, Rogatec and Tornyiszentmiklós/Pince.