SL

Public consultation documentation for incremental capacity

Based on Article 27 of the Commission Regulation (EU) 2017/459 (NC CAM) this analysis concerns the draft project proposal on the incremental capacity project for the Tornyiszentmiklós/Pince (HU/SI) interconnection point (IP)  and incremental capacity at Šempeter/Gorizia IP (SI/IT) as a potential incremental capacity projects.

IMPORTANT

Documents

Emergency calls 24h:
+386 1 582 06 66